Constructing and Equipping Batouleih Pumping Station to Provide Water to Villages in Tyre and Bint Jbeil Cazas
Scope of Work
The project works consist of the following:
- Electro-mechanical works include drilling and Equipping of Boreholes as well as the construction and equipping of a central pumping station with the required potable Water Networks and the related automation control system, the Installation of a water hammer system, chlorination units and the electric installation.
- Public works including sidewalks construction, concrete and asphalt paving for public areas, external lighting, electric cabling and power group installation landscaping and garden plantation and irrigation works; storm and sewer line concrete and natural storm retaining walls, excavation demolition and fencing works.
- Structural and finishing works of the Water Reservoirs and the main building (management): including concrete and reinforced concrete works, masonry works, plastering, rendering and spatter dash, painting, tiling and natural stone cladding, roof tiles and attics, wood works steel and aluminum, kitchen and toilets supplements, electric works and internal lighting, sanitary fixtures and plumbing, and water proofing.
Notification Order & Commencement: No.6158 13/05/2002
Completion: 12/05/2004